The project consisted of construction of a radio telemetry system which was installed at 14 wells, the 3.0‑MG reservoir, and 13 lift stations throughout Red Bluff. A computer workstation and
auto dialers were also installed at City Hall for monitoring, controlling, and alarming the water and wastewater collection systems. A total of 26 facility control systems were modified to incorporate radio communications.
The total cost of the project was $300,000. Chris Abrahamsen was the Project Manager on this project.